Traffic News: Temporary Traffic control (multi-way signals) at both ends of Vicarage Road next to Watford General Hospital to last up until 16th & 24th June.
Repair work is being carried out by UK Power Networks and we were told “if it was left, it could cause an explosion which would take out the whole road, and possibly part of the hospital” alleged the repair man parked up there waiting for another contractor.
Traffic had builtup back to Willow Lane, and in the opposite direction towards Whippendell Road, and then the third way to Whiggenhall Road. (project ref: UE000307578Z)
There seems to be no update from Herts Highways on this. But there is Resurfacing scheduled.
Hagden Lane, Watford | Resurfacing | 16 – 23 June 2022 (8pm – 5am) |
Five people charged in a counter-terrorism investigation including arson & breaches of the National Security…
The education watchdog in England has prompted Ofsted to update its inspection guidance of Schools…
Royal Navy wardship HMS Diamond has shot down a missile fired by the Iranian-backed Houthis…
UK’s defence budget to rise to 2.5% of GDP by 2030, countering threats from autocratic…
King's Guard horses bolt through London streets, injured riders and horse had hit bus.